AISILE

Age-restricted product information

This site is intended for licensed trade buyers and adults of legal vaping age in their jurisdiction. It contains information about nicotine-containing products. Not for sale to minors.

TRADE ONLY — wholesale pricing released after account approval TRADE ONLY
Regulatory hub
AISILE Replacement Pods

Inside the factory.

Pod manufacturing is an assembly and filling discipline, not a moulding one. This page covers how the line is organised, where the quality gates sit, and how batches stay traceable.

Shenzhen, ChinaGMT+8Third-party inspection supported

Facility

What the factory is set up to do

The plant is organised around pod assembly and filling, with the device side handled as a hosted platform rather than a separate production line.

ShenzhenManufacturing base
50+Markets shipped to
15–30Days mass production
7–15Days sampling
Pod assembly and filling area, product photography
Finished pod packaging, product photography

Photography above is from the current AISILE catalogue. A facility walkthrough photo set and a live video call slot are available on request with your enquiry.

Production capacity, line count and headcount are not listed here. Those numbers are confirmed directly with buyers during qualification so they reflect the current state of the floor rather than a stale brochure figure.

Quality control

Four gates, not one final check

A leak found at filling is cheap. A leak found in a container in Rotterdam is not. The gates are placed where rework is still possible.

GATE 01

Incoming material

Incoming inspection on pods, wick, coil, sealing components and packaging against the agreed specification.

GATE 02

Assembly & seal

In-process checks on seal integrity and fitment during assembly, before filling.

GATE 03

Filling & flavour

Fill volume and flavour consistency verified per batch against the approved sample.

GATE 04

Outgoing & traceability

Final inspection, batch records and traceability pack prepared for shipment.

Documentation

Traceability and third-party inspection

What a buyer receives with a batch, and what an inspector is allowed to look at.

Table 1 — Batch documentation and inspection scope.
ItemWhat it coversDelivered with batchStatus
Batch recordProduction date, line, quantityYesConfirmed
Material traceabilityComponent lots used in the batchOn requestConfirmed
Fill volume recordVerification against specificationOn requestConfirmed
Seal integrity recordLeak test resultsOn requestConfirmed
Certificate of conformityManufacturer declarationOn requestTBC
Test report / COAThird-party laboratory resultsOn requestTBC
Third-party inspectionBuyer-appointed inspector on siteSupportedConfirmed
Factory audit reportSocial / quality audit copyOn requestTBC

Swipe the table sideways to see every column →

We support third-party inspection on request. If your market requires an independent laboratory report, raise it before production starts — reports obtained after a batch has shipped cannot fix a specification problem, only document it.

Production flow

How an order moves through the plant

01

Component prep

Pods, wick, coil and sealing components staged and inspected.

02

Assembly

Pod base, coil and mouthpiece assembled to the approved sample.

03

Filling & sealing

Flavour filled to specification, then sealed and leak-checked.

04

Pack & ship

Packaged to your dieline, batch records compiled, released for shipment.

Next step

Ask for the current factory pack.

Facility photos, a video walkthrough slot and the batch documentation list are available on request. Send your enquiry and the sales team will arrange it alongside your quotation.

WhatsApp sales Email the factory 2026 catalogue
Tweaks 试调参数
Accent
Page surface
Section rhythm

Brand gold is #C9A96E — the accent used on the live AISILE site.