Inside the factory.
Pod manufacturing is an assembly and filling discipline, not a moulding one. This page covers how the line is organised, where the quality gates sit, and how batches stay traceable.
Facility
What the factory is set up to do
The plant is organised around pod assembly and filling, with the device side handled as a hosted platform rather than a separate production line.


Photography above is from the current AISILE catalogue. A facility walkthrough photo set and a live video call slot are available on request with your enquiry.
Production capacity, line count and headcount are not listed here. Those numbers are confirmed directly with buyers during qualification so they reflect the current state of the floor rather than a stale brochure figure.
Quality control
Four gates, not one final check
A leak found at filling is cheap. A leak found in a container in Rotterdam is not. The gates are placed where rework is still possible.
GATE 01
Incoming material
Incoming inspection on pods, wick, coil, sealing components and packaging against the agreed specification.
GATE 02
Assembly & seal
In-process checks on seal integrity and fitment during assembly, before filling.
GATE 03
Filling & flavour
Fill volume and flavour consistency verified per batch against the approved sample.
GATE 04
Outgoing & traceability
Final inspection, batch records and traceability pack prepared for shipment.
Documentation
Traceability and third-party inspection
What a buyer receives with a batch, and what an inspector is allowed to look at.
| Item | What it covers | Delivered with batch | Status |
|---|---|---|---|
| Batch record | Production date, line, quantity | Yes | Confirmed |
| Material traceability | Component lots used in the batch | On request | Confirmed |
| Fill volume record | Verification against specification | On request | Confirmed |
| Seal integrity record | Leak test results | On request | Confirmed |
| Certificate of conformity | Manufacturer declaration | On request | TBC |
| Test report / COA | Third-party laboratory results | On request | TBC |
| Third-party inspection | Buyer-appointed inspector on site | Supported | Confirmed |
| Factory audit report | Social / quality audit copy | On request | TBC |
Swipe the table sideways to see every column →
We support third-party inspection on request. If your market requires an independent laboratory report, raise it before production starts — reports obtained after a batch has shipped cannot fix a specification problem, only document it.
Production flow
How an order moves through the plant
Component prep
Pods, wick, coil and sealing components staged and inspected.
Assembly
Pod base, coil and mouthpiece assembled to the approved sample.
Filling & sealing
Flavour filled to specification, then sealed and leak-checked.
Pack & ship
Packaged to your dieline, batch records compiled, released for shipment.
Next step
Ask for the current factory pack.
Facility photos, a video walkthrough slot and the batch documentation list are available on request. Send your enquiry and the sales team will arrange it alongside your quotation.